1. It is important to identify the details of network sections and devices that will be affected or involved in a new design. This information is included in which section of the Network Design Requirements Document?
• Project Goal
• Project Scope
• Technical Requirements
• Current State of the Network
2. Which two pieces of information does the network designer need to determine if the Cisco IOS of a router requires an upgrade? (Choose two.)
• amount of NVRAM installed
• model number of the router
• number of interfaces and installed HWICs
• installed Cisco IOS feature set and version
• error statistics for each interface
3. Which three pieces of information need to be considered when selecting the proper Cisco IOS version for an upgrade? (Choose three.)
• processor ID
• interface type
• amount of DRAM
• bootstrap version
• device make and model
• size of system flash memory
4. What are two practices a network technician should follow when installing a new interface card in a router? (Choose two.)
• Be sure the interface card faceplate does not touch the chassis rear panel.
• Do not tighten the captive screws until the router has been powered on and recognizes the card.
• Store the blank faceplate inside the card slot to be used if the card is removed.
• Handle the interface card by the edges to avoid static discharge.
• Push the interface card into place until the edge connector is seated securely
5. The new serial interface card for the router arrives and the network technician reads that it is hotswappable. What does this mean?
• The card cannot be installed while the router is powered on because static discharge could damage the card.
• The card cannot be installed until the router is powered off and completely cooled down.
• The card can be installed while the router is powered on if the router supports this technology.
• The card is a replacement and must be installed in the same slot as the card it is replacing.
6. Refer to the exhibit. A network administrator issues the command shown to gain knowledge about a poorly documented network. Which two pieces of information can the network administrator discover from the command output? (Choose two.)
• One connected device has router capability.
• The entire network contains a total of five Cisco devices with CDP enabled.
• None of the directly connected network devices have been configured with an IP address.
• Device EDGE_2811 is connected to port Fast Ethernet 0/0 on device C3750-24_MDF.
• Five Cisco devices with CDP enabled are directly connected to device C3750-24_MDF
7. Refer to the exhibit. Which of the three Cisco IOS images shown will load into RAM?
• The router selects an image depending on the value of the configuration register.
• The router selects the third Cisco IOS image because it is the most recent IOS image.
• The router selects the second Cisco IOS image because it is the smallest IOS image.
• The router selects an image depending on the boot system command in the configuration.
• The router selects the third Cisco IOS image because it contains the advipservicesk9 image.
8. An administrator wants to download a new Cisco IOS software version to the local router. Which command performs this task?
• copy tftp flash
• copy flash run
• copy start tftp
• copy flash tftp
• copy tftp start
9. Refer to the exhibit. The top of the output shows the Cisco Feature Navigator regarding a Cisco IOS image that the administrator wants to install on a router. Below it is the output from the show version command for that router. Which statement is true regarding the capacity of the router to run this Cisco IOS image?
• There is not enough DRAM and flash.
• There is enough DRAM and flash.
• There is enough DRAM but not enough flash.
• There is enough flash but not enough DRAM.
10. Which two items are objectives of a WLAN design site survey? (Choose two.)
• identify coverage areas
• determine primary AP locations
• determine what AP equipment should be purchased
• determine how many users will access the WLAN
• identify the bottleneck of the LAN infrastructure
11. Refer to the exhibit. Which two actions improve the weaknesses of the topology shown, assuming that each access layer segment is in its own subnet? (Choose two.)
• Implement redundant links to each server by adding additional NICs.
• Implement a reduntant link from all access layer switches to Admin, Dist, and Server Farm.
• Implement a backup firewall with a link to a secondary ISP and implement a redundant link to the DMZ.
• Implement reduntant links from the existing firewall to all access layer switches.
• Implement redundant links from the DMZ to Admin and Dist.
12. A company is beginning to analyze their new Cisco IOS upgrade requirements. What is one of the router components that a network administrator must consider when selecting a new Cisco IOS version?
• processor type
• storage space in NVRAM
• interfaces and modules to be supported
• compatibility of the bootstrap version with the new Cisco IOS software
13. An employee at a company notices that the wireless signal strength indicator on his laptop fluctuates from good to low. The network administrator decides to do a site survey of that area. Which three factors need to be included in the survey? (Choose three.)
• type and model number of the WNIC of the laptop
• number of users in the area
• location of the AP
• list of MAC addresses filtered by the AP
• number of simultaneous applications running on the laptop of the employee
• location of walls and filing cabinets in the office
14. The new network design for AnyCompany must include support of voice and video traffic. Before upgrading, the network designer checks whether the existing devices can support the new requirements. Which three items does the designer need to check? (Choose three.)
• number of routers and switches owned by AnyCompany
• routers that will support extra ASICs and WWICs
• size of DRAM and flash on each device
• routers that will support HWICs and VWICs
• system bootstrap version on each router and switch
• modules supported on the loaded Cisco IOS
15. A new Cisco IOS version has been copied into flash from a TFTP server. When a reload is issued to upgrade the Cisco IOS, the router freezes part of the way through the loading process. What could be the problem?
• There is enough flash but not enough RAM in the router.
• The new HWIC cards have not been installed yet.
• The TFTP server needs to be present during a reload.
• The new Cisco IOS should have been loaded into NVRAM.
• The new bootstrap version is not compatible with the original version on the router.
16. Refer to the exhibit. A network designer has no documentation and is attempting to create a logical diagram of the network using the output from show commands. What can be determined from the output shown?
• The device with the ID of ISP is a router on the Internet.
• The attached switch is a VTP server in the Toronto domain.
• The designer cannot telnet to the attached switch.
• The Cisco router IOS supports enterprise-level voice and video technologies.
17. A production router is reloaded and finishes with a Router> prompt. What three facts can be determined? (Choose three.)
• POST occurred normally.
• The boot process was interrupted.
• There is not enough RAM or flash on this router.
• A full version of the Cisco IOS was located and loaded.
• A configuration file was not located in NVRAM or from a TFTP server.
• The router did not locate the Cisco IOS in flash, so it defaulted to ROM.
18. During a site survey, the network designer noticed that people were accessing the company wireless network from the parking lot. What should be done to stop the wireless signal from radiating out into the parking lot?
• change the channel on the wireless AP
• connect the wireless AP to a firewall
• change the type of antenna attached to the AP
• move the wireless AP to a secure VLAN
• move the wireless AP to a port on a Layer 3 switch
19. A network design project includes a review of the existing network. What is the purpose of this phase of the project?
• eliminate the need for a site survey
• shorten the timeframe of the project
• lower the cost of the project by removing redundant links and devices
• determine if the number of applications used within the company can be reduced
• To determine what existing network devices require upgrades to meet the new
20. Refer to the exhibit. Based upon the Cisco IOS file naming convention, what is represented by the value ipvoicek9 listed in the IOS filename?
• version
• file format
• feature set
• hardware platform
21. Refer to the exhibit. What two items can be determined from the output? (Choose two.)
• R2 is a Cisco 2600 device.
• R2 has 22 MB of RAM installed.
• The version of the IOS is 12.3.
• Over 8 MB of NVRAM is installed.
• A new 36 MB IOS file can be installed on the device.
22. During a wireless site survey, a consultant is determining the hours of peak usage and the estimated number of users in each location. The consultant is currently in what step of the site survey process?
• the defining of customer requirements
• the identification of coverage areas
• the determining of preliminary AP locations
• the measurement of signal strength
23. Refer to the exhibit. The network administrator is attempting to install a new version of the IOS on R2. Based on the exhibited output, what are two possible reasons that the transfer failed?(Choose two.)
• The administrator did not enable TFTP on R2.
• There is not enough flash available to store the new IOS.
• Connectivity between R2 and the TFTP server was not verified.
• The copy command was incorrectly entered.
• The administrator did not verify that the TFTP server is running.
24. In which section of the Network Design Requirements document would a network consulting team detail names and IP addresses of important networking components and servers, provide network diagrams and topologies, and define strengths and weaknesses of the network?
• network requirements
• project scope
• overall project goal
• state of the network
1. During an evaluation of the currently installed network, the IT staff performs a gap analysis to determine whether the existing network infrastructure can support the desired new features. At which stage of the Cisco Lifecycle Services approach does this activity occur?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase
• Optimize Phase
2. Which stage of the Cisco Lifecycle Services strategy is usually completed before an organization issues a Request For Proposal (RFP) or Request For Quotation (RFQ)?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase
• Optimize Phase
3. What is the purpose of SNMP?
• to facilitate the exchange of information between devices and the NMS
• to monitor and control managed network devices
• to report user logins to a monitoring station
• to verify traffic throughout the network and keep a log of all activity
4. During an analysis of a customer network, several possible opportunities for network improvement are identified. At which stage of the Cisco Lifecycle Services does this process occur?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Optimize Phase
• Operate Phase
5. What provides the initial data for the Optimize Phase?
• performance monitoring
• business goals
• technical goals
• RFP
6. Which two statements are true regarding the response to an RFQ?(Choose two.)
• The response should be brief.
• it should strictly conform to the formatting requirements specified by the RFQ.
• Only the items that the contracting company will be addressing should be answered.
• The response helps the customer compare pricing with other potential contractors.
• The response is more complicated than a response to a RFP.
7. What are two disadvantages of using a bottom-up approach instead of a top-down approach to network design? (Choose two.)
• It can result in an inappropriate network design.
• A new design cannot be implemented right away.
• It does not take into account the business goals of the company.
• This approach is not commonly practiced and is therefore not as well known.
• It requires tedious and time-consuming meetings with the customer to develop an understanding of the organization.
8. What is a business constraint that may impact the WAN design of a company?
• company policy regarding specific operating systems on LAN devices
• current monitoring protocols implemented on end-user devices
• non-availability of end users during implementation
• company policy requiring the use of specific vendor networking equipment due to partnerships
9. What is the purpose of preparing a business case?
• to justify the financial investment in implementing the technology change
• to provide an example of a previous job done in the RFP
• to define the technical requirements of the network
• to define timelines and critical milestones
10. What is the purpose of creating a prioritized list of technical requirements?
• defines the project scope
• determines the business profitability
• creates a feasibility report for analysis
• identifies existing and new user groups
11. A network engineer is analyzing the network of a potential client company to identify problems and determine whether a network upgrade or addition is needed. Which role in the sales team is this engineer assuming?
• post-sales field engineer
• pre-sales engineer
• account manager
• network designer
12. Which two statements best describe the responsibilities of an account manager? (Choose two.)
• acts as the primary point of contact between the company and the client
• directs the sales teams and support personnel
• provides technical support to critical clients
• selects the equipment and technologies to be used for the client solution
• acts as the network design lead
13. What is the purpose of system-level acceptance testing?
• To develop an installation plan for the newly designed network
• to train end users and support personnel on the newly installed network
• to check that the newly installed network meets the business goals and design requirements
• to justify the financial investment required to implement the technology change
14. What is a purpose of establishing a network baseline?
• It provides a statistical average for network performance.
• It manages the performance of network devices.
• It creates a point of reference for future network evaluations.
• It checks the security configuration of network devices.
15. When should a network baseline be performed within the stages of the Cisco Lifecycle Services?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase
16. What are two benefits of using a top-down approach instead of a bottom-up approach to network design? (Choose two.)
• incorporates organizational requirements • allows for a quick response to a design request
• requires less time up front to create a network design
• clarifies design goals from the perspective of applications and network solutions
• facilitates a design by using devices and technologies that are based on previous experience
17. Which software component is installed on network devices that are managed through SNMP?
• management agents
• management stations
• network management protocol
• Management Information Base (MIB)
18. A network engineer working for a contracting company is informed of a pre-bid meeting with a potential client. What purpose does the network engineer have for attending the pre-bid meeting?
• to submit request for proposal responses
• to discuss proposed installation and monitoring plans
• to perform system-level acceptance tests on the current network
• to clarify project scope and timelines not included in the original request for proposal
• to create a business case outlining reasons for financial investment in a network upgrade
19. A major corporation has decided to hire someone to upgrade their network infrastructure. A network consulting company wants the job. What document must the network consulting company obtain to learn about the business goals, the project scope, the requirements for the new network and the expected deliverables?
• Business Case
• Project Plan
• Request for Proposal
• Request for Comments
20. A corporation (client) wants a network upgrade and is putting out a request for services to various network consulting companies (contractors). A RFQ is required. Which statement is true concerning the RFQ?
• sent from the contractors to the client in response to a RFP
• sent from the client to the contractors along with the RFP to provide more specific technical details
• sent from the client to the contractors in place of a RFP when the technical specifications of a project are known
• sent from the contractors to the client outlining reasons for financial investments for the network upgrade
21. Which stage of the Cisco Lifecycle Services involves proactive management to identify and resolve issues before the organization is affected?
• Prepare Phase
• Plan Phase
• Design Phase
• Implement Phase
• Operate Phase
• Optimize Phase
22. Why is it important to prioritize business goals when developing network design?
• to ensure that the least expensive technologies are implemented first
• to simplify the configuration, administration, and monitoring of the newly installed network
• to anticipate the effects of changes and growth of the business
• to adhere to the best opportunities to contribute to the success of the business
23. Which two items help identify business goals and priorities before a new network project starts? (Choose two.)
• installation
• motivation
• profitability
• trustworthiness
• customer satisfaction
24. A network engineer working for ABC company is writing a response to an RFP for a network upgrade and must create an executive summary. Which statement describes the basic components of an executive summary?
• quick overview of the problem, the recommended solution, and the justification for ABC company doing the job
• detailed description of the solution, including but not limited to, timelines, turnover schedule, warranty information, and emergency recovery information
• detailed description of costs including, the cost of software and hardware components, licensing requirements, labor cost, and other applicable fees
• multiple page document containing additional information such as detailed lists of equipment required, diagrams, company background information, and insurance coverage
25. In a network management architecture, which statement best describes a management agent?
• communication protocol used between a management station and managed device
• standardized database that a device keeps about itself concerning network performance parameters
• host with the management application loaded that is used by the administrator to monitor and configure network devices
• software running on a managed device to collect network information and allow that device to be managed by a management station